December 01, 2015
On November 21, 2015, with the completion of a series of actions, such as the gradual rise, movement and landing of the 3600 ton Jumbo hoisting steel beam system designed and manufactured by LKING STEEL LIMITED., the prefabricated components of the bridge deck with the largest volume and the highest self weight of Hong Kong Zhuhai Macao bridge were successfully put in place, which announced the Qingzhou airlines, the world-renowned Hong Kong Zhuhai Macao Bridge located in Hong Kong section All roads and bridges are connected. This hoisting, also in the history of bridge hoisting wrote a thick and colorful.
The main bridge works of Hong Kong Zhuhai Macao Bridge include Qingzhou channel bridge, Jianghai direct ship channel bridge and Jiuzhou channel bridge. The above-mentioned Qingzhou channel bridge is a cable-stayed bridge with double tower and double cable plane steel box girder, with a maximum span of 458 meters and a main tower height of 163 meters. It is the navigation hole bridge with the largest span and the highest main tower of Hong Kong Zhuhai Macao Bridge. After completion, it will become the theme shape of "China knot".
The hoisting steel beam system is composed of 3600t truss girder, 3600t general girder sling, 3600t box girder, large diameter (168mm) steel wire rope sling, connecting shackle and other products. Juli rigging Co., Ltd. participated in the whole process of hoisting scheme design and hoisting steel beam system production. With its excellent skills in the field of hoisting, Juli rigging Co., Ltd. guaranteed the smooth implementation of the project.
Enter Your Message